References: [1] Li, W.D., Guo, R., Zhang, L., Qiao J.G. (2021). Multi-target large cargo transportation corridor selection method based on PCA improved analytic hierarchy process. Journal of Safety Science and Technology, 17(02) 135-139.
[2] He, T.B., Tu, H.B., Tan, J.H., Wang, S., Lin, L.G., Zeng, C.H. (2018). Discussion on application method of binding and reinforcement of large cylindrical transport objects. Journal of Chongqing Jiaotong University (Natural Science), 37(06)104-109.
[3] Sun, Y., Wu, W. (2020). Load-bearing capacity evaluation process and theory of the bridge during heavy-cargo transportation. Shandong Transportation Science and Technology, (04)134-137.
[4] Jia, X., Wu, M. (2019). Risk identification and systematic response of sea-transportation for super large cargo. Logistics Engineering and Management. 41(10)154-156.
[5] Liang, X.Q. (2022). Comprehensive evaluation of risk level of road transport of dangerous goods, Journal of Highway and Transportation Research and Development. 39(04) 184-190.
[6] Li, L., Zhou, R.Y., Wang, L.R., Yang, B.F., Zheng, S.Q. (2022). Risk assessment of road bridge transportation of hazardous chemicals based on regret theory. Safety and Environmental Engineering. 29(02) 71-77.
[7] Zhang, Y., Shuai, B., Yin, D.Z., Zhang, R., Tu, Y.F., Yu, Y.C., Huang, W.C. (2020). Risk-accident analysis method of railway dangerous goods transportation system based on STAMP-ISM. Journal of Safety Science and Technology, 16 (09) 147-153.
[8] Leng, C.B., Guo, X.W., Cai ,W.L., Jiang, X.G., Li, W.T., Ha,n C.D., Xiao, Y. (2017). Risk analysis and countermeasures of bulky transportation in UHV power grid engineering design stage. China Market. (25) 111-114.
[9] Li, F., Yang, Y., Shen, S.J., Xing, Q.S. (2011). Research on risk evaluation of highway-transportation project for massive products based on gray analytic network process evaluation. Mechanics, 38(06) 3 8-44.
[10] Min, D. (2015). The safety risk analyze of large-scale equipment transportation based on Bow-tie model. Master thesis of Xihua University.
[11] Athanasios, T. (2017). Incorporating real-time traffic and weather data to explore road accident likelihood and severity in urban arterials. Journal of Safety Research, 61:9-21.
[12] Eljko, A., Xu, X.C., Duan, L., Darko, B. (2018). Identifying the safety factors over traffic signs in state roads using a panel quantile regression approach. Traffic Injury Prevention, 19(6)607-614.
[13] Jiang, S.Q., Chen, W.J., Xie, Q.M., Wang J.H., Zhang P.F. (2020). Identification of critical causes of marine accidents based on correlation analysis. Navigation of China, 43(04)33-38.
[14] Feng, Y.Q., Li, X.M., Li, X.W. (2014). Comprehensive evaluation method for the railway safety based on the entropy method and the grey relation analysis. Journal of Safety and Environment, 14(02)73-79.
[15] Xiao, D.D., Zhang, W.F. (2010). Key element analysis for green logistics development by using Decision Making Trial and Evaluation Laboratory Method. Industrial Engineering Journal, 13(01) 52-57.
[16] Su, J.N., Shi, C.F. (2009). ISM-Based impact factor analysis in the selection of logistics mode in manufacturing enterprises. Industrial Engineering Journal, 12 (04) 6-10.
[17] Zhu, J.Y., Chen, G.M., Cao E.Z., Dai Z.L. (2020). Study on influencing factors of deepwater blowout risk based on DEMATEL/ISM. Journal of Safety Science and Technology, 16 (08)5-10.
[18] Chen, P., Li, Y. (2017). Research on the formation and the version evolution of 2-4 Model. Industrial Safety and Environmental Protection, 43 (07) 51-54. |